Problem 5: Ridge Regression as a MAP Estimator (Gaussian Prior + Gaussian Likelihood)

Setup

Let

  • Prior on coefficients:
    \(\boldsymbol{\beta} \sim \mathcal{N}(\mathbf{0}, \tau^2 \mathbf{I})\)
  • Sampling model (likelihood):
    \(\mathbf{y}\mid \boldsymbol{\beta} \sim \mathcal{N}(\mathbf{X}\boldsymbol{\beta}, \sigma^2 \mathbf{I})\)

We will show the ridge regression estimator is the MAP (posterior mode) and then relate the ridge penalty \(\lambda\) to \(\sigma^2\) and \(\tau^2\).


Likelihood and Prior (up to proportionality)

Likelihood

\(p(\mathbf{y}\mid \boldsymbol{\beta}) \propto \exp!\left( -\frac{1}{2\sigma^2}\|\mathbf{y}-\mathbf{X}\boldsymbol{\beta}\|_2^2 \right)\)

Prior

\(p(\boldsymbol{\beta}) \propto \exp!\left( -\frac{1}{2\tau^2}\|\boldsymbol{\beta}\|_2^2 \right)\)


Posterior and Log Posterior

By Bayes’ rule (dropping constants not depending on \(\boldsymbol{\beta})\):

\(p(\boldsymbol{\beta}\mid \mathbf{y}) \propto p(\mathbf{y}\mid \boldsymbol{\beta}).p(\boldsymbol{\beta}) \propto \exp\left( -\frac{1}{2\sigma^2}\|\mathbf{y}-\mathbf{X}\boldsymbol{\beta}\|_2^2 -\frac{1}{2\tau^2}\|\boldsymbol{\beta}\|_2^2 \right)\)

Taking logs (again ignoring additive constants):

\(\log p(\boldsymbol{\beta}\mid \mathbf{y}) = -\frac{1}{2\sigma^2}\|\mathbf{y}-\mathbf{X}\boldsymbol{\beta}\|_2^2 -\frac{1}{2\tau^2}\|\boldsymbol{\beta}\|_2^2 + C\)

Maximizing the posterior is equivalent to minimizing the negative log posterior:

\(\boldsymbol{\beta}_{\text{MAP}} = \arg\min_{\boldsymbol{\beta}} \left\{ \frac{1}{2\sigma^2}\|\mathbf{y}-\mathbf{X}\boldsymbol{\beta}\|_2^2 + \frac{1}{2\tau^2}\|\boldsymbol{\beta}\|_2^2 \right\}\)

Multiplying the objective by \(2\sigma^2\) (which does not change the minimizer):

\(\boldsymbol{\beta}_{\text{MAP}} = \arg\min_{\boldsymbol{\beta}} \left\{ \|\mathbf{y}-\mathbf{X}\boldsymbol{\beta}\|_2^2 + \frac{\sigma^2}{\tau^2}\|\boldsymbol{\beta}\|_2^2 \right\}\)

This is exactly the ridge regression objective.


Closed-Form Solution (MAP = Ridge)

Differentiate the negative log posterior (or the ridge objective) and set to zero.

From \(\frac{1}{2\sigma^2}\|\mathbf{y}-\mathbf{X}\boldsymbol{\beta}\|_2^2 + \frac{1}{2\tau^2}\|\boldsymbol{\beta}\|_2^2\)

the gradient w.r.t. \(\boldsymbol{\beta}\) is \(-\frac{1}{\sigma^2}\mathbf{X}^\top(\mathbf{y}-\mathbf{X}\boldsymbol{\beta}) +\frac{1}{\tau^2}\boldsymbol{\beta}\)

Set equal to zero: \(-\frac{1}{\sigma^2}\mathbf{X}^\top\mathbf{y} +\frac{1}{\sigma^2}\mathbf{X}^\top\mathbf{X}\boldsymbol{\beta} +\frac{1}{\tau^2}\boldsymbol{\beta} =0\)

Multiply by \(\sigma^2\): \(\mathbf{X}^\top\mathbf{X}\boldsymbol{\beta} +\frac{\sigma^2}{\tau^2}\boldsymbol{\beta} = \mathbf{X}^\top\mathbf{y}\)

Factor: \(\left(\mathbf{X}^\top\mathbf{X}+\frac{\sigma^2}{\tau^2}\mathbf{I}\right)\boldsymbol{\beta} = \mathbf{X}^\top\mathbf{y}\)

Thus, \(\boxed{\boldsymbol{\beta}_{\text{MAP}} = \left(\mathbf{X}^\top\mathbf{X}+\frac{\sigma^2}{\tau^2}\mathbf{I}\right)^{-1}\mathbf{X}^\top\mathbf{y}}\)


Relationship Between \(\lambda\), \(\sigma^2\), and \(\tau^2\)

The ridge estimator is commonly written as: \(\hat{\boldsymbol{\beta}}_{\text{ridge}} = (\mathbf{X}^\top\mathbf{X}+\lambda \mathbf{I})^{-1}\mathbf{X}^\top\mathbf{y}\)

Comparing with the MAP solution above gives: \(\boxed{\lambda = \frac{\sigma^2}{\tau^2}}\)

Equivalently: \(\boxed{\tau^2 = \frac{\sigma^2}{\lambda}}\)


Interpretation

  • Larger noise variance \(\sigma^2\) \(\Rightarrow\) stronger regularization (larger \(\lambda\)).
  • Larger prior variance \(\tau^2\) (weaker prior shrinkage) \(\Rightarrow\) smaller \(\lambda\).
  • Ridge is MAP under a zero-mean isotropic Gaussian prior.