Problem 5: Ridge Regression as a MAP Estimator (Gaussian Prior + Gaussian Likelihood)
Setup
Let
- Prior on coefficients:
\(\boldsymbol{\beta} \sim \mathcal{N}(\mathbf{0}, \tau^2 \mathbf{I})\) - Sampling model (likelihood):
\(\mathbf{y}\mid \boldsymbol{\beta} \sim \mathcal{N}(\mathbf{X}\boldsymbol{\beta}, \sigma^2 \mathbf{I})\)
We will show the ridge regression estimator is the MAP (posterior mode) and then relate the ridge penalty \(\lambda\) to \(\sigma^2\) and \(\tau^2\).
Likelihood and Prior (up to proportionality)
Likelihood
\(p(\mathbf{y}\mid \boldsymbol{\beta}) \propto \exp!\left( -\frac{1}{2\sigma^2}\|\mathbf{y}-\mathbf{X}\boldsymbol{\beta}\|_2^2 \right)\)
Prior
\(p(\boldsymbol{\beta}) \propto \exp!\left( -\frac{1}{2\tau^2}\|\boldsymbol{\beta}\|_2^2 \right)\)
Posterior and Log Posterior
By Bayes’ rule (dropping constants not depending on \(\boldsymbol{\beta})\):
\(p(\boldsymbol{\beta}\mid \mathbf{y}) \propto p(\mathbf{y}\mid \boldsymbol{\beta}).p(\boldsymbol{\beta}) \propto \exp\left( -\frac{1}{2\sigma^2}\|\mathbf{y}-\mathbf{X}\boldsymbol{\beta}\|_2^2 -\frac{1}{2\tau^2}\|\boldsymbol{\beta}\|_2^2 \right)\)
Taking logs (again ignoring additive constants):
\(\log p(\boldsymbol{\beta}\mid \mathbf{y}) = -\frac{1}{2\sigma^2}\|\mathbf{y}-\mathbf{X}\boldsymbol{\beta}\|_2^2 -\frac{1}{2\tau^2}\|\boldsymbol{\beta}\|_2^2 + C\)
Maximizing the posterior is equivalent to minimizing the negative log posterior:
\(\boldsymbol{\beta}_{\text{MAP}} = \arg\min_{\boldsymbol{\beta}} \left\{ \frac{1}{2\sigma^2}\|\mathbf{y}-\mathbf{X}\boldsymbol{\beta}\|_2^2 + \frac{1}{2\tau^2}\|\boldsymbol{\beta}\|_2^2 \right\}\)
Multiplying the objective by \(2\sigma^2\) (which does not change the minimizer):
\(\boldsymbol{\beta}_{\text{MAP}} = \arg\min_{\boldsymbol{\beta}} \left\{ \|\mathbf{y}-\mathbf{X}\boldsymbol{\beta}\|_2^2 + \frac{\sigma^2}{\tau^2}\|\boldsymbol{\beta}\|_2^2 \right\}\)
This is exactly the ridge regression objective.
Closed-Form Solution (MAP = Ridge)
Differentiate the negative log posterior (or the ridge objective) and set to zero.
From \(\frac{1}{2\sigma^2}\|\mathbf{y}-\mathbf{X}\boldsymbol{\beta}\|_2^2 + \frac{1}{2\tau^2}\|\boldsymbol{\beta}\|_2^2\)
the gradient w.r.t. \(\boldsymbol{\beta}\) is \(-\frac{1}{\sigma^2}\mathbf{X}^\top(\mathbf{y}-\mathbf{X}\boldsymbol{\beta}) +\frac{1}{\tau^2}\boldsymbol{\beta}\)
Set equal to zero: \(-\frac{1}{\sigma^2}\mathbf{X}^\top\mathbf{y} +\frac{1}{\sigma^2}\mathbf{X}^\top\mathbf{X}\boldsymbol{\beta} +\frac{1}{\tau^2}\boldsymbol{\beta} =0\)
Multiply by \(\sigma^2\): \(\mathbf{X}^\top\mathbf{X}\boldsymbol{\beta} +\frac{\sigma^2}{\tau^2}\boldsymbol{\beta} = \mathbf{X}^\top\mathbf{y}\)
Factor: \(\left(\mathbf{X}^\top\mathbf{X}+\frac{\sigma^2}{\tau^2}\mathbf{I}\right)\boldsymbol{\beta} = \mathbf{X}^\top\mathbf{y}\)
Thus, \(\boxed{\boldsymbol{\beta}_{\text{MAP}} = \left(\mathbf{X}^\top\mathbf{X}+\frac{\sigma^2}{\tau^2}\mathbf{I}\right)^{-1}\mathbf{X}^\top\mathbf{y}}\)
Relationship Between \(\lambda\), \(\sigma^2\), and \(\tau^2\)
The ridge estimator is commonly written as: \(\hat{\boldsymbol{\beta}}_{\text{ridge}} = (\mathbf{X}^\top\mathbf{X}+\lambda \mathbf{I})^{-1}\mathbf{X}^\top\mathbf{y}\)
Comparing with the MAP solution above gives: \(\boxed{\lambda = \frac{\sigma^2}{\tau^2}}\)
Equivalently: \(\boxed{\tau^2 = \frac{\sigma^2}{\lambda}}\)
Interpretation
- Larger noise variance \(\sigma^2\) \(\Rightarrow\) stronger regularization (larger \(\lambda\)).
- Larger prior variance \(\tau^2\) (weaker prior shrinkage) \(\Rightarrow\) smaller \(\lambda\).
- Ridge is MAP under a zero-mean isotropic Gaussian prior.